13107 Rose Ave

Website Portfolio Description

Rolen Construction completed the development of a thoughtfully designed detached Accessory Dwelling Unit (ADU) in the Mar Vista neighborhood of Los Angeles, California. Built above an existing detached garage, this project transformed underutilized property space into a fully independent residential unit while maximizing functionality, privacy, and long-term property value.

The new 715-square-foot residence features two bedrooms, two full bathrooms, an open-concept kitchen and living area, dedicated laundry space, and a spacious private balcony that expands the home’s indoor-outdoor living experience. Designed to blend seamlessly with the existing property, the ADU delivers modern residential comfort while preserving the character of the site.

This project reflects Rolen Construction’s expertise in detached ADU development, residential infill construction, and efficient use of existing property assets. By integrating contemporary design with practical living solutions, the completed residence provides flexible housing opportunities and significant long-term value for the property owner.

SEO Website Version

Detached ADU Construction in Mar Vista | 13109 Rose Avenue

Rolen Construction completed the construction of a detached 715-square-foot ADU in Mar Vista, Los Angeles. Built above an existing detached garage, the new residence includes two bedrooms, two bathrooms, an open-concept living space, private laundry, and an approximately 265-square-foot balcony.

The project demonstrates Rolen Construction’s experience delivering high-quality detached ADUs that maximize property potential while creating attractive, functional housing solutions. From structural construction and building systems installation to interior finishes and final completion, Rolen managed the project through every phase of development.

Rolen Construction specializes in ADU construction, detached ADU development, urban infill housing, residential additions, and property value enhancement projects throughout Southern California.

Project Facts

  • Project Name: 13109 Rose Avenue ADU Development
  • Location: Mar Vista, Los Angeles, California
  • Project Type: Detached ADU Development
  • General Contractor: Rolen Construction
  • ADU Size: 715 SF
  • Private Balcony: Approx. 265 SF
  • Layout: 2 Bedrooms / 2 Bathrooms
  • Construction Type: New ADU Above Existing Detached Garage
  • Construction Start: April 2024
  • Completion Date: April 2025
  • Status: Completed

Construction Highlights

  • Detached ADU Development
  • Residential Infill Construction
  • Above-Garage ADU Design
  • Open-Concept Living Area
  • Two-Bedroom Layout
  • Two Full Bathrooms
  • Private Outdoor Balcony
  • Modern Kitchen Design
  • Dedicated Laundry Space
  • Property Value Enhancement
  •  Efficient Site Utilization
  •  High-Quality Residential Finishes

Project Outcome

The completed ADU successfully transformed existing property infrastructure into a modern independent residence that expands housing capacity while enhancing the overall value of the property. The project demonstrates how strategic detached ADU development can create functional living space without compromising privacy, usability, or architectural character.

Through careful planning and quality construction, Rolen Construction delivered a residence that provides flexibility for multi-generational living, rental opportunities, or guest accommodations while maximizing the potential of the existing site.

Project Update

Project Status: Completed

Construction Timeline:

  • Start: April 2024
  • Completion: April 2025

Major Milestones Achieved:

  •  Site preparation completed
  • Structural modifications to existing garage completed
  • New ADU construction completed
  • Balcony construction completed
  • Mechanical, electrical, and plumbing systems completed
  • Interior finishes completed
  • Final inspections completed
  • Project successfully delivered

Final Result:
The project delivered a fully functional detached ADU featuring two bedrooms, two bathrooms, contemporary living spaces, and private outdoor amenities, creating a valuable long-term asset for the property owner while contributing additional housing within an established Los Angeles neighborhood.

11566 Barman Ave, Culver City

Website Portfolio Description

Rolen Construction completed the Barman Street ADU Development in Los Angeles, California, transforming an existing detached garage into a modern Accessory Dwelling Unit while incorporating a thoughtfully designed addition to maximize livable space and functionality.

The completed residence features approximately 918 square feet of living space and includes two bedrooms, one bathroom, an open-concept kitchen and living area, dedicated laundry space, and modern residential finishes. By combining adaptive reuse with new construction, the project successfully converted underutilized property space into a fully independent dwelling that enhances both housing capacity and property value.

Completed in September 2025, this project showcases Rolen Construction’s expertise in garage conversions, ADU additions, residential infill development, and high-quality construction throughout Southern California.

SEO Website Version

Los Angeles ADU Builder | 11566 Barman Street Garage Conversion ADU

Rolen Construction completed the conversion of an existing detached garage into a new Accessory Dwelling Unit with an addition at 11566 Barman Street in Los Angeles, California. The project created a modern two-bedroom residence featuring an efficient floor plan, open living spaces, and contemporary finishes.

The development demonstrates how garage conversion ADUs can maximize underutilized property space while creating valuable new housing opportunities and increasing long-term property value.

Rolen Construction specializes in garage conversions, ADU construction, residential additions, urban infill housing, and property improvement projects throughout Southern California.

Project Facts

  • Project Name: 11566 Barman Street ADU Development
  • Location: Los Angeles, California
  • Project Type: Garage Conversion ADU + Addition
  • General Contractor: Rolen Construction
  • Approximate Living Area: 918 SF
  • Layout: 2 Bedrooms / 1 Bathroom
  • Existing Garage Converted to ADU
  • New Addition Included
  • Construction Start: December 2024
  • Completion Date: September 2025
  • Status: Completed

Construction Highlights

  • Garage-to-ADU Conversion
  • Residential Addition
  • Two-Bedroom Layout
  • Open-Concept Living Area
  • Dedicated Laundry Area
  •  Modern Kitchen Design
  • Adaptive Reuse Construction
  • Residential Infill Development
  • Property Value Enhancement
  • High-Quality Residential Finishes

Project Outcome

The completed project transformed an existing garage structure into a fully independent residential unit that provides modern, functional living space while maximizing the use of the property. Through a combination of adaptive reuse and targeted new construction, the development increased housing capacity and delivered long-term value for the property owner.

The project serves as an example of how garage conversion ADUs can efficiently create additional housing while maintaining compatibility with existing residential properties.

Project Update

Project Status: Completed

Construction Timeline:

  • Start: December 2024
  • Completion: September 2025

Major Milestones Achieved:

  • Design and permitting completed
  • Demolition and site preparation completed
  • Garage conversion completed
  • Structural addition completed
  • Mechanical, electrical, and plumbing systems completed
  • Interior finishes completed
  • Final inspections completed
  • Project successfully delivered

Final Result:
A completed two-bedroom ADU created through the conversion of an existing garage and new addition, delivering a modern residential unit and increased property value.

5744 Allott Ave, Van Nuys

Project Status: Completed
Construction Timeline: March 2025 – October 2025

Website Portfolio Description

Rolen Construction completed the transformation of an existing detached garage and storage structure into a modern Accessory Dwelling Unit (ADU) at 5744 Allott Avenue in Van Nuys, California. The project included the conversion of the existing structures as well as a carefully designed addition that expanded the living area and enhanced overall functionality.

The completed residence provides approximately 724 square feet of living space and features two bedrooms, two full bathrooms, an open-concept kitchen and living area, dedicated laundry facilities, and modern residential finishes throughout. By repurposing underutilized structures and integrating new construction, the project created a fully independent dwelling while maximizing the property’s existing footprint.

This development highlights Rolen Construction’s expertise in garage conversions, ADU additions, residential infill construction, and value-driven property improvements.

Project Facts

Location: Van Nuys, California
Project Type: Garage Conversion ADU + Addition
ADU Size: Approximately 724 SF
Layout: 2 Bedrooms / 2 Bathrooms
Construction Start: March 2025
Completion Date: October 2025
Status: Completed

Construction Highlights

  • Garage-to-ADU Conversion
  • Storage Conversion
  • ADU Addition
  • Two-Bedroom Layout
  • Two Full Bathrooms
  • Open-Concept Living Area
  • Modern Kitchen
  • Dedicated Laundry Room
  • Residential Infill Development
  • Property Value Enhancement

Project Outcome

The completed project successfully transformed underutilized accessory structures into a modern and fully independent residential unit. Through strategic planning, adaptive reuse, and targeted new construction, the development maximized the functionality of the site while creating additional housing capacity.

803 E Edgeware Rd

Edgeware Residence

Website Portfolio Description

The Edgeware Residence is a 2,387-square-foot custom hillside home that showcases Rolen Construction’s expertise in delivering complex residential projects in challenging site conditions. Built on a steeply sloped lot, the project required extensive site coordination, structural precision, and careful execution to bring a highly detailed design to life.

The residence features a spacious primary suite with a private bathroom, a dedicated study, a loft suite with a full bathroom, and a powder room for guests. Open living spaces, expansive glazing, and thoughtfully integrated outdoor areas create a seamless connection between the home and its natural surroundings while maximizing natural light and views throughout the property.

In addition to the main residence, the project includes a detached accessory dwelling unit (ADU), further enhancing the property’s functionality and long-term value.

From site preparation and structural construction to the final stages of interior finishes, Rolen Construction has managed every phase of the build with a focus on quality craftsmanship, attention to detail, and project execution. The project is currently progressing through interior painting, finish detailing, and exterior improvements, including construction of the custom driveway gate, with completion anticipated in July 2026.

Edgeware Residence reflects Rolen Construction’s commitment to building distinctive custom homes that combine quality construction, thoughtful execution, and lasting value.

Project Facts

  • Custom Hillside Residence
  • 2,387 SF
  • 1 Primary Suite
  • 1 Loft Suite
  • 2 Full Bathrooms
  • 1 Powder Room
  • Dedicated Study/Home Office
  • Detached ADU
  • Multi-Level Outdoor Living Areas
  • Construction Start: June 2024
  • Estimated Completion: July 2026

Project Update

Website Portfolio Description

The Edgeware Residence is a 2,387-square-foot custom hillside home that showcases Rolen Construction’s expertise in delivering complex residential projects in challenging site conditions. Built on a steeply sloped lot, the project required extensive site coordination, structural precision, and careful execution to bring a highly detailed design to life.

The residence features a spacious primary suite with a private bathroom, a dedicated study, a loft suite with a full bathroom, and a powder room for guests. Open living spaces, expansive glazing, and thoughtfully integrated outdoor areas create a seamless connection between the home and its natural surroundings while maximizing natural light and views throughout the property.

In addition to the main residence, the project includes a detached accessory dwelling unit (ADU), further enhancing the property’s functionality and long-term value.

From site preparation and structural construction to the final stages of interior finishes, Rolen Construction has managed every phase of the build with a focus on quality craftsmanship, attention to detail, and project execution. The project is currently progressing through interior painting, finish detailing, and exterior improvements, including construction of the custom driveway gate, with completion anticipated in July 2026.

Edgeware Residence reflects Rolen Construction’s commitment to building distinctive custom homes that combine quality construction, thoughtful execution, and lasting value.

Project Facts

  • Custom Hillside Residence
  • 2,387 SF
  • 1 Primary Suite
  • 1 Loft Suite
  • 2 Full Bathrooms
  • Dedicated Study/Home Office
  • Detached ADU
  • 1 Powder Room
  • Multi-Level Outdoor Living Areas
  • Construction Start: June 2024
  • Estimated Completion: July 2026

Project Update

Project Status: Interior Finishes

The project has entered the final phase of construction. Interior painting and finish detailing are currently underway throughout the residence, while exterior work continues with the fabrication and installation of the custom driveway gate.

Key Milestones Achieved

  • Site preparation and grading completed
  • Foundation construction complete
  • Structural framing completed
  • Roofing and exterior envelope completed
  • Window and door installation completed
  • Mechanical, electrical, and plumbing rough-ins completed
  • Insulation and drywall completed
  • Interior millwork and major finish installations substantially completed

Current Activities

  • Interior painting
  • Finish carpentry and detailing
  • Final fixture installation
  • Driveway gate construction and installation
  • Final site improvements

Expected Completion
July 2026

Project Duration
June 2024 – July 2026