Rolen Construction is currently reconstructing a custom two-story single-family residence in Pacific Palisades following wildfire damage to the original home. The project consists of a complete fire rebuild designed to meet current California building standards, energy-efficiency requirements, and enhanced wildfire-resistance regulations applicable to properties located within a Very High Fire Hazard Severity Zone (VHFHSZ).
The new residence features approximately 1,640 square feet of living space and an attached 358-square-foot garage. Designed for long-term resilience and modern living, the home incorporates upgraded structural systems, fire-resistant materials, energy-efficient mechanical systems, and contemporary architectural detailing while maintaining compatibility with the surrounding neighborhood.
Construction began in June 2026 and is progressing on an accelerated eight-month schedule. Upon completion, the project will provide a durable, code-compliant replacement residence that reflects Rolen Construction’s commitment to quality craftsmanship, efficient project delivery, and successful wildfire recovery construction throughout Southern California.
Project Facts
- Project Name: 683 N Hampden Pl Fire Rebuild
- Location: Pacific Palisades, Los Angeles, CA 90272
- Project Type: Residential Fire Rebuild
- Building Type: Two-Story Single-Family Residence
- Construction Type: Type VB
- Living Area: 1,640 SF
- Garage Area: 358 SF
- Total Built Area: 1,998 SF
- Lot Size: Approximately 2,994 SF
- Construction Start: June 2026
- Estimated Duration: 8 Months
- Estimated Completion: February 2027
- Status: Under Construction
- Architect / Engineer: SMS Design & Engineering
Construction Highlights
- Complete wildfire recovery residential rebuild
- New two-story custom residence with attached garage
- Construction within a Very High Fire Hazard Severity Zone (VHFHSZ)
- Enhanced wildfire-resistant building assemblies
- Class A roofing system and ember-resistant detailing
- Energy-efficient HVAC and ventilation systems
- Modern waterproofing and air-barrier systems
- Engineered structural framing and foundation systems
- Los Angeles Green Building Code compliance
- Accelerated eight-month construction schedule
Project Update
Project Status: Under Construction
Construction commenced in June 2026 and is currently progressing through the early phases of development. The project is being delivered as a complete wildfire recovery rebuild, replacing a previously damaged residence with a new code-compliant custom home designed for enhanced resilience, safety, and long-term performance.
Current Activities
- Site mobilization and construction startup
- Foundation and structural construction coordination
- Trade scheduling and procurement
- Building systems coordination
- Ongoing project management and quality control
Upcoming Milestones
- Structural framing
- Roofing installation
- Building envelope completion
- MEP rough-ins
- Insulation and drywall
- Interior finishes
- Final inspections
- Certificate of Occupancy
Expected Completion
February 2027
Project Duration
June 2026 – February 2027